Detail Pergantian GTM
| Tanggal | 29-07-2026 11:00 |
|---|---|
| Lokasi | ALU C |
| Operator | Ahmad Riadi |
| Nomor DO | 008809 DO/GEI-GAS/2026 |
| Plat GTM Lama | B 9415 KEI |
| Plat GTM Baru | H 8302 OQ |
| Pressure Awal GTM Lama | 180.00 |
| Pressure Akhir GTM Lama | 20.00 |
| Pressure Awal GTM Baru | 180.00 |
| Pressure Out | 2.80 |
| VM Awal | 343132.00 |
| VM Akhir | 343999.00 |
| Total VM | 867.00 |
| VB Awal | 873598.37 |
| VB Akhir | 876849.95 |
| Total VB | 3251.58 |
| Catatan | Stanby T03 (20BAR) |