Detail Pergantian GTM
| Tanggal | 30-07-2026 18:45 |
|---|---|
| Lokasi | SMKL |
| Operator | Rafli |
| Nomor DO | Off |
| Plat GTM Lama | H 8585 CG |
| Plat GTM Baru | Off |
| Pressure Awal GTM Lama | 100.00 |
| Pressure Akhir GTM Lama | 35.00 |
| Pressure Awal GTM Baru | 0.00 |
| Pressure Out | 2.20 |
| VM Awal | 67241.00 |
| VM Akhir | 67383.00 |
| Total VM | 142.00 |
| VB Awal | 193726.20 |
| VB Akhir | 194164.80 |
| Total VB | 438.60 |
| Catatan | Gtm 05/20ft Press 95 Barg |